Arrange of Tourism Infrastructure at Ananuri Castle Abbreviated Resettlement Action Plan



Yüklə 0,7 Mb.
Pdf görüntüsü
səhifə25/28
tarix09.03.2018
ölçüsü0,7 Mb.
#31056
1   ...   20   21   22   23   24   25   26   27   28

66 

 

for a family of 5 is 



fixed at 338.3 GEL for 

three month.  

PAP’s will receive 

20% of: 


338.3X 3 month = 

203GEL  


Temporary 

suspention of 

incomes 

Employees 

8 PAP,s 

PAP’s  will  be  given 

compensation for three 

month. 


The 

compensation  will  be 

calculated 

by 


considering 

the 


subsistence  minimum 

fixed  for  a  5-member 

family.  At  present,  the 

subsistence  minimum 

for  a  family  of  5  is 

fixed at 338.3 GEL for 

three month. 

PAP’s will receive 2 

338.3X  3  month  = 

1015 GEL 

Temporary 

suspention/redu

ction of 

incomes 


One Company

 

1 PAP 



Reduction: The profit  

calculated based on the 

official document 

submitted by the 

business owner – a 

Tax Declaration. 

PAP’s will be given 

20% of profit for three 

month. 

 

If Suspension: 



The 

profit  calculated based 

on the official 

document submitted 

by the business owner 

– a Tax Declar. 

Will 

be given profit for 



three month. 

Allowances 

Relocation. 

Relocation costs 

Only one PAP use 

the carige for sailing 

the products. 

As relocation cost PAP 

will get 50 GEL. 




67 

 

Vulnerable 



People 

Allowances(bel

ow the 

poverty line, 



families 

lead by single 

women, 

refuges, 



disabled 

belongs I and II 

groups and 

elderly) 

 

Afs  below poverty 



line, headed by 

Women, disabled or 

elderly 

Allowance equivalent 

to 3 months of 

minimum subsistence 

income for a family of 

five* and employment 

priority in project-

related jobs. This is 

additional allowance 

for vulnerability status 

on top of that of other 

entitlements in this 

matrix. 

Unconsidered Damage 

Temporary 

impact 

during 


construction 

 

AP 



Due compensation will 

be assessed and paid 

based on this RPF 

during construction. 

Unforeseen 

impact 


 

 

MDFG  and  the  



construction  

contractor  will 

address   and   

mitigate/compensate   

unforeseen 

Resettlement impact 

during project. 

 

Consultation Company “Eco-Spectri” Ltd. hired within the scope of the project will accomplish 



the social-economic study of the project zone and will develop a Resettlement Action Plan. 

Attention! 

The  study  will  be  accomplished  on  April  23-28  of  2017,  with  April  28  to  be  a  critical  date 

consequently.    Under  the  World  Bank  requirements,  it  is  inadmissible  to  make  any  changes  or 

amendments to the social-economic study accomplished following the critical date. 



Contact Information: 

“Eco-Spectri” Ltd  

Tbilisi, Chavchavadze Ave 7,  

Phone: 2 90 44 22; 

Fax: 2 90 46 39; 

Mail: 


info@eco-spectri.ge

  

 



Contact Persons: 

Irakli Kaviladze 

Project Manager 



68 

 

Mob: 5 99 979748; 



 

Social Team 

Zurab Revazishvili: 555 26 81 08; 

David Kaviladze: 599 99 01 61 

 



69 

 

Annex 3:  Questionnaire 



 

Family member interviewed                   

Date                              

Checklist #  

Name of the respondent  

Date - - - 

 

The information booklet of the project was delivered:                                                                                                                               



Signature 

 

Name of the Head of Household 



 

 

1.   Household Characteristics 

 

Name, Surname 

G

ende



A

ge

 

E

thn

ic 

G

roup

 

R

el

ig

ion

 

Education 

Inco


m

pl

et



Seconda


ry

C



om

pl

et



ed 

Seconda


ry

 

Prof



ess

iona


/Techn


ic

al

 



H

igh Scho


ol

 

Il



li

ter


at



Head of Household 



(HoH) 

 

 



 

 

 



 

 

 



 

 

Other Members of 



Family (with notes 

on relationship with 

the HoH) 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

 

 



 

2.   Residence area 

 

Residence area 

Urban 


Rural 


Yüklə 0,7 Mb.

Dostları ilə paylaş:
1   ...   20   21   22   23   24   25   26   27   28




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə