Design presented is part of 12 GeV Upgrade Project at JLAB

  • Design presented is part of 12 GeV Upgrade Project at JLAB

    • Requires 10 each 100 MV cryomodules (C100)
    • Requires 80 cavities (7 cell, 1497 MHz, CW)
    • Production schedule spans FY09,10 and 11.
  • Original design used Titanium Helium Vessel

  • New design uses Stainless Steel Helium Vessel











Helium vessel design was validated by:

  • Helium vessel design was validated by:

  • Thermal shock in liquid nitrogen & leak check of braze joint (x3/joint)

  • VTA cycle to 2K (x2/cav)

  • Thermal cycle to 2K in HTB (x1)

  • Functionally tested in HTB

  • Pressure test of “Helium Vessel Head Test Fixture”

  • Note : HTB is the Horizontal Test Bed – a facility for testing up to two cavities with cryomodule boundary conditions













HTB test verified that the design meets the requirements