ERIX 1146 May Blitz
Work Plan
Preparation -
Place to store tools in/near car.
-
Seal kitchen side door.
-
208Y shore power.
-
Sell Coleman generator.
-
Plan under-car equipment layout.
-
Purchase steel for vestibule and transformer mounting.
-
Find used/junk HEP connectors for locating purposes.
-
Purchase Exane for transformer connection.
-
Purchase nickel-plated kitchen plumbing.
Main Work -
Rebuild vestibule and B-end collision posts.
-
Paint vestibule.
-
Vestibule trim work (with available parts.)
-
Clear space for transformers.
-
Mount and wire transformers.
Optional Work -
Clean crud off interior paint and stainless.
-
Clean accumulated dirt off understructure of car.
-
Install kitchen lavatory, plumbing, and towel dispenser.
-
Identify correct B-end box seats.
-
Finish dining room light fixtures.
-
Install thermostat.
-
Finish restroom plumbing.
-
Inspect water reservoir.
-
Continue lighting circuit rewiring.
Planned Next -
Replace overhead HVAC equipment.
-
Dining room walls, floor, side sill and collision posts.
Dostları ilə paylaş: |