Urban road toll collection in Norway – process, technology and experiences from Oslo

  • Kristian Wærsted

  • Chief Engineer

  • Norwegian Public Roads Administration (NPRA)


Road tolling in Norway

  • 70 years of road tolling experience to finance expensive infrastructure (bridges and tunnels)

  • More than 100 road toll projects implemented

  • Toll collection normally lasts for 15 years

  • 44 road toll projects in operation today

  • Urban toll systems for the last 20 years

  • Point payment only (open systems)

  • Norway has been a pioneering country in developing cost efficient road tolling



Tolling Projects in Norway by 2005



Urban toll rings in Norway – May 2005



The ”Oslo Package 1”

  • Why?: To build 50 pre-defined projects in 10 instead of 35 years with state funds only

  • Joint venture between Oslo (60%) and the neighbouring county of Akershus (40%)

  • Users contribute with 55% of funding

  • The toll ring covers all roads in three corridors

  • 50% of Oslos population live outside the toll ring



Oslo toll plaza no. 5 on a western arterial

  • The subscription lane (”AutoPASS”) has a high capacity, approx. 1600 veh/hour

  • Approx. 300 veh/hour capacity in coin machine and attended (”manuell”) lanes

  • No expansion of total road area was necessary



Toll plaza no.14 on E6 south



Toll plaza no.11 on E6 north is the largest in Oslo. It has 3+1 AutoPASS lanes