1) Readiness of the testing rooms and storage spaces Testing & Storage for QTC & IQC: ready! Bonding & Testing space: ready! Storage module: Testing & Storage for petals: - for pre-prod (ready when needed)
- for production: available summer-fall (staged)
- Assembly & Testing & Storage in new hall!
Operations layout at Karlsruhe
2.) Readiness of Readout I (ARC)
Fasttest II
2/3.) Readiness of Readout III Diagnose (FED-based)
4) Readiness of the LT single module set-up! We have NO dedicated SINGLE LT teststation! KA LT Plan! Use of the Fastteststation (II) with active cooling! 4.1) General comments on software! Fastteststation soft 4.2) is the LT single module set-up commissioned? FASTTEST YES 4.4) list of missing equipment to enter into production! Ready 4.5) Are results obtained with ARC and LT in your lab in agreement? - Basically YES,
- final x-calibration still to be done!
The final production LT will be done on petal basis.
Stability: Calibrated with cosmics
Several modules tested in Aachen and Karlsruhe. Full comparison with TEC Expressline I, already presented in several prior meetings (and partially by analysing Expressline II modules) Many basic and analysis results already shown in several meetings! - pinhole tests, basic defect analysis
- TEC Expressline I & II
- single shot test beam
- Test of irradiated hybrids --- modules forseen ( active cooling)
- Ongoing scratch and high leakage current tests
- Starting of bond tests in high magnetic field @4T
1 FED 1 FEC 7+1 OEC LV (ordered), HV, LLN cooling plant (ordered) actual need for prototype petal: - 4 optical hybrids + 1 OEC (already in house, but requested for X5)
- Optical cables
- Interconnectboard inc. CCUM
New Hall