Pakistan “glof” project



Yüklə 22,22 Kb.
Pdf görüntüsü
tarix05.02.2018
ölçüsü22,22 Kb.
#24623


Rovshen Nurmuhamedov, PS E&E and Merdan Hudaykuliyev, PMS AF  

Project: “Addressing Climate Change Risks to 

Farming Systems in Turkmenistan at the national 

and local levels” (Turkmenistan)

 


 

 

 

Project is implementing in three different  ecological zonez of 



Turkmenistan ….  

Nohur project region 

Karakum project region 

Sakarchaga project region 

 

 






• Construction and repairement of 10 dams with water reservoirs 

Agreed adaptation measures implemented 

Nohur Project region  





Reconstruction and repair of the existing drip irrigation system (20 ha - 10 ha garden, 10 ha - vegetables)  

Agreed adaptation measures implemented 

Nohur Project region  





Afforestation with the participation of local population – Junierus Turcomanica  

Agreed adaptation measures implemented 

Nohur Project region  



Local Nursery for growing of seedlings and organization of the production of organic-compost and bio-humus 






Construction of concrete basin (capacity - 400 м3) for water storage 


Agreed adaptation measures implemented 

Karakum Project region 

 




• Total area of desert pastures consists about 850,0 

thousand.hа

.  

Agreed adaptation measures implemented 

Karakum Project region 

 

• Sand dune fixation works



 

• Local Nursery 




Agreed adaptation measures implemented 

Karakum Project region 

 

Construction of 7 new wells 



using the traditional method 

Construction of 7 new wells using the traditional method 


Agreed adaptation measures implemented 

Karakum Project region 

 



• The capital repair of 4 sardobs - 500 м3 

Agreed adaptation measures implemented 

Karakum Project region 

 



Agreed adaptation measures implemented 

Karakum Project region 

 

• The capital repair of 4 sardobs - 500 м3 




Construction of 11 new sardobs using the 

traditional method - 60 м3

 

Agreed adaptation measures implemented 

Karakum Project region 

 




Construction of 16 water regulating devices with one 

oulet/discharge, and one water-regulating device with 

two outlet/discharges 

Agreed adaptation measures implemented 

Sakarchaga Project region 

 



• Reconstruction and cleaning of the interfarm 

collector  (31,5 км) 

• Local Nursery  



Agreed adaptation measures implemented 

Sakarchaga Project region 

 



Synergism of AF and CRM projects 


Pilot Region Sakarchaga 

• Amendments to Water Code, Law ‘On Farmers Unions’, new Draft 



Law “On Water Users Association” 

• Rules and Regulations of Water Users Groups (WUG), relations of 



WUGs with Farmers Union, in the territory of which they are 

located.  

• Economic Incentives for saving water 

• Introduction of tariffs for water delivery service 

• Analysis of benefits of adaptation measure to local communities 

• 60% – payment based on profitableness of the crop; 

• 40% - payment based on actual supplied volume of water



 

• Establishment of 5 new Water Users Groups (WUGs) 

• Introduction of water measuring tools into practice 

• Field Research on drainage water salinity, level and effect on the 



crop yield. 

• Coordination of implementation of adaptation measures – drainage 



collector cleaning, drainage collector construction, abandoned 

saline soils reclamation, laser levelling, nursery production for 

growing young plants of fruit bearing and none fruit treas. 

• Soil and water testing and analysis. 




Pilot Region Sakarchaga 

• Field Trainings, Water evaporation, transpiration, 



infiltration losses, setting up observation wells

measuring water volume 