SSLH744Y20APRFRABKK UM2/7,10
3
Add OS elements to the airline to advise the details of the responsible
person who will be dropping off the UMNR at the originating airport and who
will be collecting them at the destination airport.
4
Check handling procedures of each particular airline on GGAIRXX page.
5
Use the
ET or
ER command to store the PNR.
Special Note
Please check with your local airline office regarding other specific information that may be required for
UMNR processing.
PNR Modification
Modify PNR Element
When making modifications to an Amadeus PNR it is important to understand the way in which the elements
are displayed.
The PNR elements are displayed in a pre-determined order. The elements themselves are numbered
sequentially beginning at element number 1.
Screen Display
It is simple to modify or cancel any PNR element, regardless of its type by referencing the element number
from the display. You simply use the element number from the PNR as a reference.
When altering itinerary or
SR elements you need to understand the special codes that are used to indicate
the status of these elements (see GGCODE: Output Action Codes).
Air/SR Element Advice Codes
Code
Meaning
Dostları ilə paylaş: