Project Management


On 28 April - 1 May 2014, Regional Programme Coordinator of UNDP Central Asian Climate Risk Management Programme (CA-CRM) conducted a monitoring mission to Ashgabat, Turkmenistan. The visit included national stakeholder consultations, and meetings with local farmers of Nohur project region and Adaptation Fund Project team. It was also discussed the work of the Project at the national level and avenues for further collaboration. (Annex 7.)

From 1 July 2014, the salary of Project Assistant on procurement of consultancy services started to cover from Project budget.


The Project team updated the status of actions from Management Response on Mid-Term Evaluation for the period April-December 2014 and submitted to the Regional office. (Annex 8.)

  1. Challenges/Lessons learned


The implementation of activity on introducing resource-saving technologies was postponed due to delays of the 2nd shipment (tractor drawn scraper) by Easyfarming Company. Hands-on training for project beneficiaries of Sakarchage project region was therefore implemented in early October 2014.
  1. Contracts for implementation of project activities

The Project activities of 2014 were implemented by national and international consultants, experts, companies and entrepreneurs listed below.


#

Objective of the assignment

Status (Concluded, Ongoing, Archived)

Duration (from - to), extended to...

Amount, $

Name of the consultant/ company

Notes on performance. Key results

1.

National consultant on

planning of institutional and

legal issues for climate risks

integration



Completed


February -

May 2014


5,500

Yolbars Kepbanov




2.

Translator

Completed

February -

June 2014



5,000

Zohra Meredova




3.

National Consultant on GIS

Completed

April -

June 2014



3,000


Nikolay Nikolayev




4.

National Consultant to conduct financial and economical assessment

Completed

April -

November 2014



3,150

Stanislav Aganov




5.

Procurement of laser levelling unit and tractor drawn scraper for local farmers of Zahmet farmer union, Sakarchaga project region

Completed


March -

June 2014



4,250

Easyfarming Company




6.

Preparation work for laser

levelling on demo site (10 ha)



Completed

April -

June 2014




12,491.23

Galkan Gala Company




7.

Procurement of a portable soil lab for farmers of Zahmet farmer union, Sakarchaga project region

Completed

May -

June 2014



1,491.22

Sheker Mollayeva, entrepreneur




8.

Procurement of Garden tool sets (30) for local growers of Nohur project area

Completed

March 2014

1, 906

Jeyhun Orazov, entrepreneur




9.

Procurement of construction materials for fencing the territory of rural school №6, Sowma, Bokurdak project region

Completed

May -

June 2014



4, 985

Sheker Mollayeva, entrepreneur




10.

International Consultant to develop a National Climate Risk Profile

Completed

May -

August 2014



15,300

Asmerom Gilau




11.

Construction of 5 water regulating devices and conducting laser land levelling of 25 ha of land in Sakarchaga project area (direct contracting).

Completed

June-

September 2014



44,395

Galkan Gala Company




12.

Designer to assist in design and preparation of CRM products

Completed

July -

December 2014



3,400

Roman Agayev




13.

National Consultant to update the report on Assessment of Water Sector in Turkmenistan

Completed

July -

October 2014



6, 500

Nazar Korpeyev




14.

National expert on technical and engineering issues of water management

Completed

July -

September 2014



2, 250

Kurban Ovezmuradov




15.

National consultant on documenting 2 best practices for project beneficiaries

Completed

July-

November 2014



4,000

Sultan Veysov




16.

Procurement of two prefabricated greenhouses from Israel

Completed

August-

December 2014



9,500

Guneshli Meydan Company




17.

International Consultant to deliver training on Integrated approach to water and fertilizer management for fruits and vegetables grown through drip irrigation system

Completed

September 2014

11,173

Jelmer Buijs




18.

National consultant to conduct stakeholder capacity assessment and evaluate the effectiveness of CRM activities

Completed

October-

December 2014



3,700

Galina Kamahina




19.

National consultant on preparation of information materials based on soil fertility assessment

Completed

October-

December 2014



3,100

Maysa Ovezgeldyeva




20.

Procurement of construction materials for fencing the territory of rural school №10, Yerbent, Bokurdak project region

Completed

October-

December 2014



4,983

Berdi Gochiyev, entrepreneur




21.

Editor to review and edit a National Climate Risk Profile of Turkmenistan

Completed

October-November 2014

1,700

G.Azizova, Uzhydromet




22.

National consultant to review a National Climate Risk Profile of Turkmenistan

Completed

December 2014

1,100

Kurban Allaberdiyev




Yüklə 0,54 Mb.