On 28 April - 1 May 2014, Regional Programme Coordinator of UNDP Central Asian Climate Risk Management Programme (CA-CRM) conducted a monitoring mission to Ashgabat, Turkmenistan. The visit included national stakeholder consultations, and meetings with local farmers of Nohur project region and Adaptation Fund Project team. It was also discussed the work of the Project at the national level and avenues for further collaboration. (Annex 7.)
From 1 July 2014, the salary of Project Assistant on procurement of consultancy services started to cover from Project budget.
The Project team updated the status of actions from Management Response on Mid-Term Evaluation for the period April-December 2014 and submitted to the Regional office. (Annex 8.) Challenges/Lessons learned
The implementation of activity on introducing resource-saving technologies was postponed due to delays of the 2nd shipment (tractor drawn scraper) by Easyfarming Company. Hands-on training for project beneficiaries of Sakarchage project region was therefore implemented in early October 2014.
Contracts for implementation of project activities The Project activities of 2014 were implemented by national and international consultants, experts, companies and entrepreneurs listed below.
#
|
Objective of the assignment
|
Status (Concluded, Ongoing, Archived)
|
Duration (from - to), extended to...
|
Amount, $
|
Name of the consultant/ company
|
Notes on performance. Key results
|
1.
|
National consultant on
planning of institutional and
legal issues for climate risks
integration
|
Completed
|
February -
May 2014
|
5,500
|
Yolbars Kepbanov
|
|
2.
|
Translator
|
Completed
|
February -
June 2014
|
5,000
|
Zohra Meredova
|
|
3.
|
National Consultant on GIS
|
Completed
|
April -
June 2014
|
3,000
|
Nikolay Nikolayev
|
|
4.
|
National Consultant to conduct financial and economical assessment
|
Completed
|
April -
November 2014
|
3,150
|
Stanislav Aganov
|
|
5.
|
Procurement of laser levelling unit and tractor drawn scraper for local farmers of Zahmet farmer union, Sakarchaga project region
|
Completed
|
March -
June 2014
|
4,250
|
Easyfarming Company
|
|
6.
|
Preparation work for laser
levelling on demo site (10 ha)
|
Completed
|
April -
June 2014
|
12,491.23
|
Galkan Gala Company
|
|
7.
|
Procurement of a portable soil lab for farmers of Zahmet farmer union, Sakarchaga project region
|
Completed
|
May -
June 2014
|
1,491.22
|
Sheker Mollayeva, entrepreneur
|
|
8.
|
Procurement of Garden tool sets (30) for local growers of Nohur project area
|
Completed
|
March 2014
|
1, 906
|
Jeyhun Orazov, entrepreneur
|
|
9.
|
Procurement of construction materials for fencing the territory of rural school №6, Sowma, Bokurdak project region
|
Completed
|
May -
June 2014
|
4, 985
|
Sheker Mollayeva, entrepreneur
|
|
10.
|
International Consultant to develop a National Climate Risk Profile
|
Completed
|
May -
August 2014
|
15,300
|
Asmerom Gilau
|
|
11.
|
Construction of 5 water regulating devices and conducting laser land levelling of 25 ha of land in Sakarchaga project area (direct contracting).
|
Completed
|
June-
September 2014
|
44,395
|
Galkan Gala Company
|
|
12.
|
Designer to assist in design and preparation of CRM products
|
Completed
|
July -
December 2014
|
3,400
|
Roman Agayev
|
|
13.
|
National Consultant to update the report on Assessment of Water Sector in Turkmenistan
|
Completed
|
July -
October 2014
|
6, 500
|
Nazar Korpeyev
|
|
14.
|
National expert on technical and engineering issues of water management
|
Completed
|
July -
September 2014
|
2, 250
|
Kurban Ovezmuradov
|
|
15.
|
National consultant on documenting 2 best practices for project beneficiaries
|
Completed
|
July-
November 2014
|
4,000
|
Sultan Veysov
|
|
16.
|
Procurement of two prefabricated greenhouses from Israel
|
Completed
|
August-
December 2014
|
9,500
|
Guneshli Meydan Company
|
|
17.
|
International Consultant to deliver training on Integrated approach to water and fertilizer management for fruits and vegetables grown through drip irrigation system
|
Completed
|
September 2014
|
11,173
|
Jelmer Buijs
|
|
18.
|
National consultant to conduct stakeholder capacity assessment and evaluate the effectiveness of CRM activities
|
Completed
|
October-
December 2014
|
3,700
|
Galina Kamahina
|
|
19.
|
National consultant on preparation of information materials based on soil fertility assessment
|
Completed
|
October-
December 2014
|
3,100
|
Maysa Ovezgeldyeva
|
|
20.
|
Procurement of construction materials for fencing the territory of rural school №10, Yerbent, Bokurdak project region
|
Completed
|
October-
December 2014
|
4,983
|
Berdi Gochiyev, entrepreneur
|
|
21.
|
Editor to review and edit a National Climate Risk Profile of Turkmenistan
|
Completed
|
October-November 2014
|
1,700
|
G.Azizova, Uzhydromet
|
|
22.
|
National consultant to review a National Climate Risk Profile of Turkmenistan
|
Completed
|
December 2014
|
1,100
|
Kurban Allaberdiyev
|
|