Water Management Plan, Lot 3, South West Highway Whitby
7
Figure 1: Looking north from lower reaches of site.
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
8
Figure 2: Looking east from lower reaches of site.
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
9
Figure 3: Looking south east from lower reaches of site, with winter creek in background.
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
10
Figure 4: Looking south from middle areas of site.
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
11
Figure 5: Looking south west from middle areas of site.
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
12
Figure 6: Looking west from middle areas of site
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
13
Figure 7: Looking north west from middle areas of site.
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
14
Figure 8: Looking north from middle areas of site
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
15
Figure 9: Looking west from upper reaches of site
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
16
Figure 10: Looking south west from upper reaches of site
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
17
Figure 11: Looking south east from land adjacent to site, winter creek in foreground
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
18
Figure 12: Looking east from land adjacent to site, winter creek in foreground
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
19
Figure 12: Looking north east from land adjacent to site, winter creek in foreground
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
20
Figure 13: Looking east from land adjacent to site, showing full extent of site
SJS TRIM - IN12/17340
OCM122.9/01/13
Water Management Plan, Lot 3, South West Highway Whitby
21
Figure 14: Looking south from land adjacent to site, winter creek in foreground, single residence (Yarrabah) in background.
SJS TRIM - IN12/17340
OCM122.9/01/13
Access Road
Cut off Drain
Prevents upstream water flows
Contoured and roughed base surface
to prevent subsurface water flows and
ensure stability
Small contour channel to
collect sediment water
Winter Creek
Natural Base Surface
Placed Overburden
Up slope cutt off drain
bank on contour
Topsoil removed and
surface roughed
Rain
fall
Natural S
lope
Water directed away
Rainfall
Water collected and released
to the watercourse through a
small sediment trapping basin
Water
directed
away
Water Management Stage 1
Lot 3 South West Highway, Whitby
October 2012
Figure 15
SJS TRIM - IN12/17340
OCM122.9/01/13
Access Road
Cut off Drain
Prevents upstream water flows
Contoured and roughed base surface
to prevent subsurface water flows and
ensure stability
Small contour channel to
collect sediment water
Winter Creek
Natural Base Surface
Placed Overburden
Up slope cutt off drain
bank on contour
Topsoil removed and
surface roughed
Rain
fall
Natural S
lope
Water directed away
Rainfall
Water collected and released
to the watercourse through a
small sediment trapping basin
Water
directed
away
Water Management Stage 2
Lot 3 South West Highway, Whitby
October 2012
Figure 16
SJS TRIM - IN12/17340
OCM122.9/01/13
Dostları ilə paylaş: |