Haiphong department of transport



Yüklə 1,53 Mb.
səhifə1/21
tarix06.05.2018
ölçüsü1,53 Mb.
#41817
  1   2   3   4   5   6   7   8   9   ...   21

H
E2615 v1 rev
AIPHONG DEPARTMENT OF TRANSPORT


Regional Transport Works Project Management Unit

ENVIRONMENTAL IMPACT ASSESSMENT

HAIPHONG URBAN TRANSPORT DEVELOPMENT PROJECT


Volume 1B: Environmental Management Plan Construction of the Bac Son – Nam Hai

East West Arterial Road

(Updated)


TABLE OF CONTENTS


1. INTRODUCTION 4

1.1 PURPOSES OF THE ENVIRONMENTAL MANAGEMENT PLAN 4

1.2. EMP ORGANIZATION AND STRUCTURE 4

2. OVERVIEW OF ENVIRONMENTAL AND SOCIAL ISSUES 7

2.1. PROJECT LOCATION AND JUSTIFICATION 7

2.2. MAIN OBJECTIVES OF BAC SON – NAM HAI EAST-WEST ARTERIAL ROAD 7

2.3. COMPONENTS OF THE PROJECT 7

2.4. MAIN ENVIRONMENTAL AND SOCIAL IMPACTS 8

2.5. SUMMARY OF MITIGATION MEASURES 12

2.6. NOISE AND AIR POLLUTION SENSITIVE RECEPTORS 15

2.7. DISPOSAL AND BORROW SITES 18

3. ROLES AND RESPONSIBILITIES FOR ENVIRONMENTAL MANAGEMENT DURING THE CONSTRUCTION PHASE 20

4. ENVIRONMENTAL COMPLIANCE FRAMEWORK 24

4.1. ENVIRONMENTAL AND SOCIAL REQUIREMENTS 24

4.2. ENVIRONMENTAL RESPONSIBILITIES OF THE CONTRACTORS 30

4.3. RESONSIBILITIES OF CONTRACTORS’ SAFETY AND ENVIRONMENT OFFICER (SEO) 31

4.4. ENVIRONMENTAL SUPERVISION DURING THE CONSTRUCTION PHASE 31

4.5. INDEPENDENT MONITORING CONSULTANT (IMC) 32

4.6. COMPLIANCE WITH LEGAL AND CONTRACTUAL REQUIREMENTS 32

4.7. NON COMPLAINCE RECTIFICATION SYSTEM 33

5. EMP IMPLEMENTATION PLAN 35

5.1. CONTRACTOR’S CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN (CEMP) 35

5.2. PROJECT INITIATION AND STAFFING 35

5.3. CAPACITY BUIDING AND ENVIRONMENTAL MANAGEMENT TRAINING 35

6. MONITORING PROGRAM 36

6.1. MONITORING OBJECTIVES 36

6.6. PROJECT COMPLETION INDICATORS 47

7.1. COST FOR IMPLEMENTATION OF THE EMP 48

7.2. COST ESTIMATION 48

APPENDIX 1: VIETNAMESE LEGAL DOCUMENTS APPLIED FOR THIS PROJECT 51

APPENDIX 2: SECTIONS AND SITES SENSITIVE TO ENVIRONMENTAL IMPACTS AND PROPOSED MEASURES FOR MITIGATION 53

APPENDIX 3: SPECIFICATIONS FOR CONTRACTORS IN ENVIRONMENTAL AND SOCIAL MANAGEMENT 73

APPENDIX 4: TERMS OF REFERENCE FOR SUPERVISION CONSULTANT’S WORKPLACE SAFETY AND ENVIRONMENT SUPERVISOR 118

APPENDIX 5: INDEPENDENT ENVIRONMENTAL MONITORING CONSULTANT (IMC) 123

APPENDIX 6: TRAINING DEMANDS AND PROPOSALS FOR A TRAINING PROGRAM 128

APPENDIX 7: ESTIMATED COST FOR ENVIRONMENTAL MONITORING 131




LIST OF TABLES AND FIGURES


Table 1: Potential Environmental and Social Impacts during the Construction 9

Figure 2: Control and Reporting Lines for the Management of Environment during the Construction phase 20

Table 5: Responsibilities for Environmental Management in the Construction Phase 20

Table 6: Minimum Environmental and Social Requirements for the Construction of the Road – At Worker’s Camps 24

Table 7: Minimum Environmental and Social Requirements for the Construction of the Road – General Construction Issues 24

Table 8: Minimum Environmental and Social Requirements for the Construction of the Road – Soil Erosion and Leakage of Eroded Materials to the Surrounding 26

Table 9: Minimum Environmental and Social Requirements for the Construction of the Project - Operation of Heavy Construction Machines 27

Table 10: Minimum Environmental and Social Requirements for the Construction of the Road - Construction Material Storage 27

Table 11: Minimum Environmental and Social Requirements for the Construction of the Road - Concrete Manufacture 27

Table 12: Minimum Environmental Requirements for the Fuel Storage Areas 28

Table 13: Minimum Environmental and Social Requirements for the Construction of the Road - Works at Bridge Construction Sites 29

Table 14: Minimum Environmental and Social Requirements for the Construction of the Road - Social Impacts 29

Table 15: Categorization of Non Compliance Infringement Levels 33

Table 16. Performance Monitoring for Compliance of Implementation of the EMP 36

Table 17: System of Environmental Monitoring Report 47

Table 18: Total Cost for the Evironmental Management Plan 48



ABBREVIATIONS







BOD

CEMP


Biochemical oxygen demand

Construction Environmental Management Plan



COD

CPC


CST

Chemical oxygen demand

Commune People Committee

Construction Supervision Team


DO

DONRE


DOT

EIA


EMP

EMS


ESO

Dissolved Oxygen

Department of Natural Resources and Environment

Department of Transport

Environmental Impact Assessment

Environmental Management Plan

Environmental Management Section within PMURTW

Environment and Safety Officer


FO

Fuel oil

GDP

HPUTDP


Gross Domestic Product

Haiphong Urban Transport Development Project



HSET

Health for Community (Health); Site Safety (Safety); Environmental Sanitation (Environment) and Transport Management (Transportation)

IFC

International Finance Company

IMC

Independent Monitoring Consultant

km

kilometer

MONRE

Ministry of Natural Resources and Environment

PC

People Committee

PM­10

Dust with diameter ≤ 10 micron

PMURTW

Project Management Unit of Regional Transport Works, Hai Phong

RAP

Resettlement Action Plan

RMB

SES


Road Management Board

Safety and Environment Supervisor



SEO

Contractor’s Safety and Environment Officer

SS

Suspended solids

T

Ton

THC

Total hydrocarbons

T.N

Total nitrogen

TOR

Terms of Reference

T.P

Total phosphorus

TS

Total solids

TSP

USD


Total suspended particulates

United States Dollar



UXO

Unexploded Ordinances

VND

Vietnam Dong

VOC

Volatile Organic Compounds

WB

World Bank

WHO

World Health Organization

1. INTRODUCTION

Yüklə 1,53 Mb.

Dostları ilə paylaş:
  1   2   3   4   5   6   7   8   9   ...   21




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə