1. INTRODUCTION 4
1.1 PURPOSES OF THE ENVIRONMENTAL MANAGEMENT PLAN 4
1.2. EMP ORGANIZATION AND STRUCTURE 4
2. OVERVIEW OF ENVIRONMENTAL AND SOCIAL ISSUES 7
2.1. PROJECT LOCATION AND JUSTIFICATION 7
2.2. MAIN OBJECTIVES OF BAC SON – NAM HAI EAST-WEST ARTERIAL ROAD 7
2.3. COMPONENTS OF THE PROJECT 7
2.4. MAIN ENVIRONMENTAL AND SOCIAL IMPACTS 8
2.5. SUMMARY OF MITIGATION MEASURES 12
2.6. NOISE AND AIR POLLUTION SENSITIVE RECEPTORS 15
2.7. DISPOSAL AND BORROW SITES 18
3. ROLES AND RESPONSIBILITIES FOR ENVIRONMENTAL MANAGEMENT DURING THE CONSTRUCTION PHASE 20
4. ENVIRONMENTAL COMPLIANCE FRAMEWORK 24
4.1. ENVIRONMENTAL AND SOCIAL REQUIREMENTS 24
4.2. ENVIRONMENTAL RESPONSIBILITIES OF THE CONTRACTORS 30
4.3. RESONSIBILITIES OF CONTRACTORS’ SAFETY AND ENVIRONMENT OFFICER (SEO) 31
4.4. ENVIRONMENTAL SUPERVISION DURING THE CONSTRUCTION PHASE 31
4.5. INDEPENDENT MONITORING CONSULTANT (IMC) 32
4.6. COMPLIANCE WITH LEGAL AND CONTRACTUAL REQUIREMENTS 32
4.7. NON COMPLAINCE RECTIFICATION SYSTEM 33
5. EMP IMPLEMENTATION PLAN 35
5.1. CONTRACTOR’S CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN (CEMP) 35
5.2. PROJECT INITIATION AND STAFFING 35
5.3. CAPACITY BUIDING AND ENVIRONMENTAL MANAGEMENT TRAINING 35
6. MONITORING PROGRAM 36
6.1. MONITORING OBJECTIVES 36
6.6. PROJECT COMPLETION INDICATORS 47
7.1. COST FOR IMPLEMENTATION OF THE EMP 48
7.2. COST ESTIMATION 48
APPENDIX 1: VIETNAMESE LEGAL DOCUMENTS APPLIED FOR THIS PROJECT 51
APPENDIX 2: SECTIONS AND SITES SENSITIVE TO ENVIRONMENTAL IMPACTS AND PROPOSED MEASURES FOR MITIGATION 53
APPENDIX 3: SPECIFICATIONS FOR CONTRACTORS IN ENVIRONMENTAL AND SOCIAL MANAGEMENT 73
APPENDIX 4: TERMS OF REFERENCE FOR SUPERVISION CONSULTANT’S WORKPLACE SAFETY AND ENVIRONMENT SUPERVISOR 118
APPENDIX 5: INDEPENDENT ENVIRONMENTAL MONITORING CONSULTANT (IMC) 123
APPENDIX 6: TRAINING DEMANDS AND PROPOSALS FOR A TRAINING PROGRAM 128
APPENDIX 7: ESTIMATED COST FOR ENVIRONMENTAL MONITORING 131
Table 1: Potential Environmental and Social Impacts during the Construction 9
Figure 2: Control and Reporting Lines for the Management of Environment during the Construction phase 20
Table 5: Responsibilities for Environmental Management in the Construction Phase 20
Table 6: Minimum Environmental and Social Requirements for the Construction of the Road – At Worker’s Camps 24
Table 7: Minimum Environmental and Social Requirements for the Construction of the Road – General Construction Issues 24
Table 8: Minimum Environmental and Social Requirements for the Construction of the Road – Soil Erosion and Leakage of Eroded Materials to the Surrounding 26
Table 9: Minimum Environmental and Social Requirements for the Construction of the Project - Operation of Heavy Construction Machines 27
Table 10: Minimum Environmental and Social Requirements for the Construction of the Road - Construction Material Storage 27
Table 11: Minimum Environmental and Social Requirements for the Construction of the Road - Concrete Manufacture 27
Table 12: Minimum Environmental Requirements for the Fuel Storage Areas 28
Table 13: Minimum Environmental and Social Requirements for the Construction of the Road - Works at Bridge Construction Sites 29
Table 14: Minimum Environmental and Social Requirements for the Construction of the Road - Social Impacts 29
Table 15: Categorization of Non Compliance Infringement Levels 33
Table 16. Performance Monitoring for Compliance of Implementation of the EMP 36
Table 17: System of Environmental Monitoring Report 47
Table 18: Total Cost for the Evironmental Management Plan 48
|
|
BOD
CEMP
|
Biochemical oxygen demand
Construction Environmental Management Plan
|
COD
CPC
CST
|
Chemical oxygen demand
Commune People Committee
Construction Supervision Team
|
DO
DONRE
DOT
EIA
EMP
EMS
ESO
|
Dissolved Oxygen
Department of Natural Resources and Environment
Department of Transport
Environmental Impact Assessment
Environmental Management Plan
Environmental Management Section within PMURTW
Environment and Safety Officer
|
FO
|
Fuel oil
|
GDP
HPUTDP
|
Gross Domestic Product
Haiphong Urban Transport Development Project
|
HSET
|
Health for Community (Health); Site Safety (Safety); Environmental Sanitation (Environment) and Transport Management (Transportation)
|
IFC
|
International Finance Company
|
IMC
|
Independent Monitoring Consultant
|
km
|
kilometer
|
MONRE
|
Ministry of Natural Resources and Environment
|
PC
|
People Committee
|
PM10
|
Dust with diameter ≤ 10 micron
|
PMURTW
|
Project Management Unit of Regional Transport Works, Hai Phong
|
RAP
|
Resettlement Action Plan
|
RMB
SES
|
Road Management Board
Safety and Environment Supervisor
|
SEO
|
Contractor’s Safety and Environment Officer
|
SS
|
Suspended solids
|
T
|
Ton
|
THC
|
Total hydrocarbons
|
T.N
|
Total nitrogen
|
TOR
|
Terms of Reference
|
T.P
|
Total phosphorus
|
TS
|
Total solids
|
TSP
USD
|
Total suspended particulates
United States Dollar
|
UXO
|
Unexploded Ordinances
|
VND
|
Vietnam Dong
|
VOC
|
Volatile Organic Compounds
|
WB
|
World Bank
|
WHO
|
World Health Organization
|