Final Draft Revised Guideline of DILRMP with manual

Total funds required (c+f+g+h)

276.92 crore

An amount of Rs. 276.92 Crore has been earmarked for this component for the period from 2017-18 to 2019-20.


Integration of spatial and textual data
Integration of textual data with spatial data for each plot will require specialized utility software and interface software which will help in matching and tuning textual record of each plot with corresponding plot map. This will be one time effort required to be performed at the time initialization. The necessary software may be developed by the NIC and made available to the States/UTs. This will help in establishing information security management system.

(c) Tehsil, sub-division and district Computer Centres
For hardware and software for land data management system at sub-divisions and districts, where needed, and for technology upgradation at some tehsil or equivalent locations. District-level database may be maintained at the district level, and the computer facilities on the sub-division level may also be used for data analysis, planning, verification, etc.
(d) State Level Data Centres (SLDC)
In order to maintain data repository and backup, each State/UT may need to establish a dedicated data centre for land records data (including maps and registration data) at the State/UT level
There are 29 States and 7 UTs (total 36). Data Centre in 15 States/UTs have been sanctioned (i) @ Rs.1.00 crore for small States / UTs and (ii) @ Rs.2.00 crore for big States at an amount of Rs.27 crore. Till now funds for an amount of Rs.18.90 crore have been released to these 15 States / UTs (to set up State level data centres) and an amount of Rs.8.10 crore is yet to be released. An amount of Rs. 37.00 crore is required for the remaining 36 (-) 15 = 21 States / UTs. The total funds required for this component are 8.10+37.00 = Rs.45.10 crore.
An amount of Rs. 45.10 Crore has been earmarked for this component for the period from 2017-18 to 2019-20.

Yüklə 3,17 Mb.

Dostları ilə paylaş:
1   ...   22   23   24   25   26   27   28   29   ...   92




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə
Psixologiya