SAILESH NAIR & ASSOCIATES
- 49 -
BOB, ANKALAV BRANCH, DIST. ANAND
1, DEFENCE KARMACHARI HSG. SOC. NR. UNITED COLONY, B/H. NAVRACHANA HIGH SCHOOL, SAMA,
VADODARA – 390 008 TELE-FAX. 0265 2784382 MOB : 9898072813 / 9427602817
8.1.3.
OBTAINING INFORMATION:
a) No claim by the Contractor for additional payment will be
entertained which is consequent upon failure on his part to
obtain correct information as to any matter affecting the
execution of the works, nor will any misunderstanding or the
obtaining of incorrect information or the failure to obtain
correct information relieve him from any risks or from the
entire responsibility for the fulfillment of the contract.
8.1.4.
THE SETTING OUT :
a) The Contractor shall at his own expense, set out the works
accurately in accordance with the plans. The Contractor shall
be solely responsible for the true and perfect setting out of
the works, and for the correctness of the position, levels,
dimensions and alignment of all parts thereof. If at any time
any errors shall appear during the progress or on completion
of any part of the work, the Contractor shall at his own cost
rectify such error if called upon to the satisfaction of the
Architect. The Bank and / or its representatives shall time to
time inspect the work but such inspections shall not
exonerate the Contractor in any way from his obligations to
remedy any defects, which may be found to exist at any
stage of the work or after the same is completed.
8.1.5.
PERFORMANCE
a) The Contractor shall be fully and solely responsible for
proper, safe and efficient design and performance of his
equipment and installation, in conformity with drawings and
parameters and specifications stipulated in the Contract
documents.
b) In case the Contractor finds that anything contained in
drawings, specifications or given parameters will not ensure
such performance and compliance with best trade practices
and codes, rules and regulations laid down by Authorities, he
shall bring such matters to the attention of the
Architect and
shall follow their instructions.
c) The contractor shall also guarantee that the performance of
the various materials and items individually shall not be less
than specified ratings when working under operating
conditions given for the respective items.
8.1.6.
EXECUTION OF WORK:
a) The whole of the work as described in the Contract (including
the Schedule of Quantities, Preamble, the Specifications and
all drawing pertaining thereto) and as advised by the
Architect from time to time is to be carried out and
completed in all its parts to the entire satisfaction of the
Architect.
SAILESH NAIR & ASSOCIATES
- 50 -
BOB, ANKALAV BRANCH, DIST. ANAND
1, DEFENCE KARMACHARI HSG. SOC. NR. UNITED COLONY, B/H. NAVRACHANA HIGH SCHOOL, SAMA,
VADODARA – 390 008 TELE-FAX. 0265 2784382 MOB : 9898072813 / 9427602817
b) Any minor details of manufacture, fabrication and installation
which are obviously and fairly intended, or which may not
have been definitely referred to in this Contract, but which
are usual in sound interiors execution practice and essential
to the work, are to be included in the Contract. Rates quoted
in the Schedules shall be inclusive of all freights, taxes, such
as Octroi, Sales Tax, Excise Tax, Work Contract Tax,
Royalties, VAT etc. as well as transportation so as to
execute the Contract as per the rules and regulations of
Local Bodies, State Government and the Government of
India, and to the full intent of tender documents.
c) Following shall be deemed to be provided for in the quoted
rates:
i)
Labour for constructing, fixing, finishing, carrying,
cleaning, making good etc.
ii)
Framework, ladders, ropes, nails, spikes, tools,
material and workmanlike protection from weather,
temporary supports.
iii)
Covering for the works during inclement weather or
strikes or whenever directed, as necessary.
iv)
All temporary canvass, lights, tarpaulin, barricades
water-sheets etc.
v)
All such temporary weatherproof sheds at such places
and in a manner approved by the
Architect for the
storage and protection of materials against the effects
of Sun or rain.
vi)
All minor civil works like breaking and making good of
masonry walls to original condition for passage of
cables, cable trays, etc.
vii)
Provision of necessary frames (MS/wooden) for
dressing up of wall/RCC openings and for installation
of Fans etc. if instructed by
Architect. Drawings for
framework to be got approved from
Architect.
viii)
The rate quoted by the Tenderer in the schedule of
probable quantities will be deemed to be for the
finished work inclusive of the cost of providing the
above items.
SITE MANAGEMENT
8.1.7.
CONTRACTOR TO PROVIDE EVERYTHING NECESSARY:
a) The Contractor shall provide everything necessary for the
proper execution of the works according to the true intent
and meaning of the Drawings, Specifications and Schedule
of Quantities taken together whether the same may or may
not be particularly shown or described therein, provided that
the same can reasonably be inferred wherefrom and if the