Thematic ielts reading practice tests toshkent «pir» nashriyoti – 2023 Cambridge English



Yüklə 3,99 Mb.
Pdf görüntüsü
səhifə5/18
tarix07.09.2023
ölçüsü3,99 Mb.
#121427
1   2   3   4   5   6   7   8   9   ...   18
Thematic IELTS Reading practice tests FRAGMENT

Cambridge IELTS Academic 17
TEST 1 
Questions 1 – 5
Complete the notes below.
Choose
 ONE WORD ONLY
 from the passage for each answer.
Write your answers in boxes 
1-5
 on your answer sheet.
The Dead Sea Scrolls
Discovery
Qumran, 1946/7

three Bedouin shepherds in their teens were near an opening on side of cliff

heard a noise of breaking when one teenager threw a 
1
.……………………

teenagers went into the 
2
.…………………… and found a number of containers 
made of 
3
.……………………
The scrolls

date from between 150 BCE and 70 CE

thought to have been written by group of people known as the 
4
.……………………

written mainly in the 
5
.…………………… language

most are on religious topics, written using ink on parchment or papyrus


8
TEST 2 READING PASSAGE 1
You should spend about 20 minutes on 
Questions 1-6
 which are based on 
Reading Passage 1 below.
[Note: This is an extract from READING PASSAGE 1 about The development 
of the London underground railway]
In the first half of the 1800s, London’s population grew at an astonishing rate, 
and the central area became increasingly congested. In addition, the expansion 
of the overground railway network resulted in more and more passengers arriving 
in the capital. However, in 1846, a Royal Commission decided that the railways 
should not be allowed to enter the City, the capital’s historic and business centre. 
The result was that the overground railway stations formed a ring around the 
City. The area within consisted of poorly built, overcrowded slums and the streets 
were full of horse-drawn traffic. Crossing the City became a nightmare. It could 
take an hour and a half to travel 8 km by horse-drawn carriage or bus. Numerous 
schemes were proposed to resolve these problems, but few succeeded.
Amongst the most vocal advocates for a solution to London’s traffic problems was 
Charles Pearson, who worked as a solicitor for the City of London. He saw both 
social and economic advantages in building an underground railway that would 
link the overground railway stations together and clear London slums at the same 
time. His idea was to relocate the poor workers who lived in the inner-city slums 
to newly constructed suburbs, and to provide cheap rail travel for them to get to 
work. Pearson’s ideas gained support amongst some businessmen and in 1851 
he submitted a plan to Parliament. It was rejected, but coincided with a proposal 
from another group for an underground connecting line, which Parliament passed.
The two groups merged and established the Metropolitan Railway Company 
in August 1854. The company’s plan was to construct an underground railway 
line from the Great Western Railway’s (GWR) station at Paddington to the edge 
of the City at Farringdon Street – a distance of almost 5 km. The organisation 
had difficulty in raising the funding for such a radical and expensive scheme, not 
least because of the critical articles printed by the press. Objectors argued that 
the tunnels would collapse under the weight of traffic overhead, buildings would 
be shaken and passengers would be poisoned by the emissions from the train 
engines. However, Pearson and his partners persisted.
The GWR, aware that the new line would finally enable them to run trains into 
the heart of the City, invested almost £250,000 in the scheme. Eventually, over 
a five-year period, £1m was raised. The chosen route ran beneath existing main 
roads to minimise the expense of demolishing buildings. Originally scheduled to 
be completed in 21 months, the construction of the underground line took three 
years. It was built just below street level using a technique known as ‘cut and 
cover’. A trench about ten metres wide and six metres deep was dug, and the 
sides temporarily help up with timber beams. Brick walls were then constructed, 
and finally a brick arch was added to create a tunnel. A two-metre-deep layer of 
soil was laid on top of the tunnel and the road above rebuilt.


9

Yüklə 3,99 Mb.

Dostları ilə paylaş:
1   2   3   4   5   6   7   8   9   ...   18




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə