reflected here, see the summary below.
Figure – Getting Electricity in Uzbekistan and comparator economies – Measure of Quality
Uzbekistan
Kazakhstan
Kyrgyz
Republic
Moldova
Russian
Federation
Europe
&
Central
Asia
0
1
2
3
4
5
6
7
8
9
Index score
8
8
4
7
8
6.2
Uzbekistan
Doing Business 2020
Page 19


Details – Getting Electricity in Uzbekistan – Procedure, Time and Cost
Takes place simultaneously with previous procedure.
No.
Procedures
Time to Complete
Associated Costs
1
Submit application and await technical conditions and connection contract with estimate
: Tashkent City Electric Network Enterprise OJSC
Agency
The customer submits an application for the electrical connection to the Tashkent City Electric
Network Enterprise and waits for them to issue technical conditions along with the connection
contract that contains the time required for the connection works as well as the connection cost
estimate.
14 calendar days
UZS 0
2
Signing connection contract and make payment
: Tashkent City Electric Network Enterprise OJSC
Agency
Upon receiving the connection contract from the utility, customer has 3 business days to sign the
contract and make the 100% prepayment for connection.
3 calendar days
UZS 56,250,000
3
Implementation of connection works by utility and inspection
: Tashkent City Electric Network Enterprise OJSC
Agency
During this procedure the Utility implements following works:
- prepares the connection design, after the receipt of the advance payment under the contract on
connection to electric networks "on a turn-key basis"(15-20 business days),
- receives preliminary approval by all stakeholder organizations (5 business days)
- finalizes design based on received comments and gets final approval (3 business days)
- upon having the design approved, utility conducts the external connection works, carries out
meter installation (15-30 business days)
- after completion of external works, inspection by the State Energy Inspectorate
"Uzgosenergonadzor" takes place (3 business days), wherein "Uzgosenergonadzor" inspects an
external power supply system and issues:
1) Certificate of technical inspection of electrical installations of consumers
2) Permit for the commissioning of electrical installations
70 calendar days
UZS 0
4

Yüklə 1,75 Mb.

Dostları ilə paylaş:
1   ...   18   19   20   21   22   23   24   25   ...   64




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə