Chandra Users’ Committee CXC Manager’s Status Report For the period April 07 – September 07 Roger Brissenden CXC Manager 19 September 2007
Topics - Program Management
- Spacecraft
- Science Instruments and Calibration
- Mission Planning
- OCC
- Data Processing
- CXCDS
- Chandra Director’s Office
- Education and Public Outreach
Mission Metrics Chandra Grant Awards
Program Level Status Program Management - Budget: NASA reduced FY07 Chandra program funding by $2.5M ($2.3M of which is from CXC). We developed approaches for absorbing the reduction without seriously impacting CXC operations, and are meeting our new budget. Submitted 2007 Program Operating Plan 5/20. Current funding goes through 11/10.
- Senior Review: Notified in April of the plan for a Senior Review of the Chandra Program in April 2008. No further details have been provided to date and HQ directed the Program to submit a budget request at the previously planned levels for FY08 and beyond.
-
- Staffing: Staff numbers remain near FY06 levels, as planned.
- Facilities: A backup version of the OCC’s computer system has been purchased and received, and is being installed in the CfA facility at Cambridge Discovery Park. String will provide backup operations capability in the event of a major outage at the OCC.
CXC Organization
Program Level Status Spacecraft - Continues to operate extremely well overall
- No spacecraft anomalies during this period
- Nominal passages through summer eclipse season, 6/24–7/12
- Instruments are operating extremely well.
- A test was conducted to turn off the ACIS detector housing heaters to assess the potential to help control the ACIS focal plan temperature.
Program Level Status Mission Planning - 4 load-interrupt TOOs:
- Accepted Target Time*
- 4/2 AXP 1E 1048.1-5937 3d 18h
- 5/27 M82 ULX 5d 5h
- 6/12 Swift J195509.6+261406 2d 2h
- 8/12 GRS 1915+105 1d 16h
- *Time from TOO approval to start of observation
OCC - The OCC completed its external security audit of the OCC’s computer systems 5/17. We await formal Authority to Process from NASA headquarters.
Program Level Status Data Processing - Automatic processing is current; time from end of observation to delivery to user remains at about one day.
- Data reprocessing (Repro 3) is complete except for the Feb 2000 safemode period; will be completed by 9/30. A ‘patch’ reprocessing of 398 observations (Repro 3A) was completed 8/12.
CXC Data System Releases - Version Date Main contents
- DS 7.6.10.4 5/16 Cycle 10 Peer Review release
- DS 7.6.11 7/2 DS infrastructure release
- DS 7.6.11.1 9/4 AP & SAP bug fix
- CIAO 4.0 1 5/16 Tools-only release
- CIAO 4.0 2 8/23 Tools & ChIPs release
Program Level Status CXC Data System Planned Releases - Version Date Main contents
- DS 7.6.11.2 10/15 ACIS params; deepfield RPS updates
- DS 7.6.11.3 12/15 Cycle 10 release: RPS upgrades, TOO GUI
- DS 7.6.12 ~2/8/08 DS Solaris 10 release
- CIAO 4.0 3 11/7 Sherpa + tools & ChIPs
- CIAO 4.0 12/15 Major CIAO data analysis release
Level 3 Catalogue (*code freeze date; 2.5-2.7 are internal DS releases) - Version Date Main contents
- CAT 2.5 7/20* Batch processing, merge pipeline, AP&archive interfaces
- CAT 2.6 11/2* L3 reprocessing & versioning; auto QA pipeline
- CAT 2.7 1/11/08* Special processing; QA pipeline
- CAT 3.0 ~5/15/08 Release to Operations; start production processing
Calibration Database (CalDB) Releases - CalDB 3.4.0 5/16 ACIS time-dependent gain corrections, blank sky, other
Program Level Status - Cycle 9 peer review of 664 proposals was held 19-22 June; results were announced on schedule, 7/12
- Check of observing parameters (for long-term schedule) finished 9/5; new process this year
- Cost proposal deadline was 9/13
Chandra Fellows program - Budgets for next year have been received, reviewed and approved
- Applications for next cycle due 10/31; review committee almost complete
- Fellows symposium at CfA to be held 10/10
Program Level Status • Education and Public Outreach - 18 press activities (1 NSU, 7 press releases, 7 image releases, 3 press postings (press results driven largely by success of NSU on SN 2006gy)
- 143 print articles (incl. 1 NY Times, 2 Wash. Post (one front page) , front page USA Today, front page Christian Science Monitor, cover of Time)
- 745 web articles
- 601 TV broadcasts including national news on ABC, CBS, NBC, major network morning shows, Fox, CNN, MSNBC,BBC)
- 5 radio broadcasts
- CBS "Evening News with Brian Williams" shows Chandra Bullet Cluster image as one of the top three images requested from its MSNBC web site.
- 11 workshops
- 5 Chandra podcasts released (see http://chandra.harvard.edu/resources/podcast
- 233 requests for 43,912 items of Chandra materials
- 71 permissions to use Chandra content and images
- Released Cycle 9 CfP and invitation letter to PI’s for EPO programs
Mission Metrics MUPS Fuel Usage
Mission Metrics Thruster Warm Starts
Mission Metrics Observing Efficiency
Data Delivery Effectiveness
Grant Award Effectiveness
Dostları ilə paylaş: |