2-
 
test 
_ Generator full power to give check Generator full tension giving at work to 
determine the number of revolutions. 
Test transfer procedure: 
-
Generator to the stand connection that's it according to remains. 
-
Voltmeter indicator following rotations slowly slowly increased goes 
-
Generator tension 12.5 _ V on the stand loading rheostat slowly slowly connects 
ammeter will be followed. 
-
Generator Voltage 12.5 In V rotations and loading by changing nominal vine strength 
installation. 
-
Tachometer indicator will be seen. 
Checking the speed description of the generator without a relay-adjuster in the running mode is 
as follows . 
3-
 
test _ 
a)
 
stand connection As in case 1-2 remains. 
-
loading adjuster handle hour per mile against until the end turns. 
-
Stand turns on 600 ayl ./ min starting from each when hundred-180 in rpm ammeter and 
Voltmeter Indicator writing is taken. 
b) the generator relay rectifier with performance: 
-
Tension automatic adjust tension vibrational adjuster through done, lead in this Tokyo 
will be changed magnet flow (F) too will change. 
-
Arousal switch relay rectifier to the situation is placed. 
4-
 
test 
_ Tension adjuster check 
-
Electric motor will be turned on and 3000-5000rpm to will be corrected. 
-
Loading through the lever 
h a l f o f the rated
load has been amperage
_ is installed. 
-
Immutable rotations in number loading by multiplying will go 
-
Loading ammeter Indicator is written. 
5-
 
test _ 
The opposite vine relay check a ). The voltage is connected. 
-
Reset pen hour per mile reverse until the end turns. 


-
Electric motor connecting rotations the number little by little is multiplied and Voltmeter 
observed. 
-
Strelka sharp to the left gone at the time voltmeter Indicator writing is taken. b). The opposite 
vine 
-
Loading restat hour to the arrow against until the end will be closed. 
-
Engine rotations to the denomination rises . 
-
Little by little rotations the number is reduced and ammeter observed. 
Measuring to the table writing 

No 
Indicators 
Measuring order 

Generator FIK 

Generator full FIK 
The report make up order. 
1.
Generators structure and types about information. 
2.
Try it scheme to bring 
3.
Generator acceleration description. 
Electronic systematic test scheme to bring 
 

Yüklə 36,48 Kb.

Dostları ilə paylaş:
1   2   3




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə