2-
test
_ Generator full power to give check Generator full tension giving at work to
determine the number of revolutions.
Test transfer procedure:
-
Generator to the stand connection that's it according to remains.
-
Voltmeter indicator following rotations slowly slowly increased goes
-
Generator tension 12.5 _ V on the stand loading rheostat slowly
slowly connects
ammeter will be followed.
-
Generator Voltage 12.5 In V rotations and loading by changing nominal vine strength
installation.
-
Tachometer indicator will be seen.
Checking the speed description of the generator without a relay-adjuster
in the running mode is
as follows .
3-
test _
a)
stand connection As in case 1-2 remains.
-
loading adjuster handle hour per mile against until the end turns.
-
Stand turns on 600 ayl ./ min starting from each when hundred-180 in rpm ammeter and
Voltmeter Indicator writing is taken.
b) the generator relay rectifier with performance:
-
Tension automatic adjust tension vibrational adjuster through done, lead
in this Tokyo
will be changed magnet flow (F) too will change.
-
Arousal switch relay rectifier to the situation is placed.
4-
test
_ Tension adjuster check
-
Electric motor will be turned on and 3000-5000rpm to will be corrected.
-
Loading through the lever
h a l f
o f the rated
load has been amperage
_ is installed.
-
Immutable rotations in number loading by multiplying will go
-
Loading ammeter Indicator is written.
5-
test _
The opposite vine relay check a ). The voltage is connected.
-
Reset pen hour per mile reverse until the end turns.
-
Electric motor connecting rotations the number little by little is
multiplied and Voltmeter
observed.
-
Strelka sharp to the left gone at the time voltmeter Indicator writing is taken. b). The opposite
vine
-
Loading restat hour to the arrow against until the end will be closed.
-
Engine rotations to the denomination rises .
-
Little by little rotations the number is reduced and ammeter observed.
Measuring to the table writing
_
No
Indicators
Measuring order
1
Generator FIK
2
Generator full FIK
The report make up order.
1.
Generators structure and types about information.
2.
Try it scheme to
bring
3.
Generator acceleration description.
Electronic systematic test scheme to bring