Work perform order
1.
Under investigation of the generator technical status is studied.
2.
Tok power normal the bag is studied.
3.
Comfortable in the circumstances voltage is studied.
4.
Testing the generator power is checked.
Try it transfer order.
1-
test
_ Generator work checked and in this salty walking
in the situation nominal to
voltage how much in the number of revolutions reach was determined.
-
Loading rheostat handle hour per mile against until the end turns.
-
Wake up switch "without adjuster" to the situation.
-
Stand engine turned on slowly slowly rotations is multiplied and Voltmeter observed.
-
12.5 _ V to voltage when it comes out tachometer Indicator will be seen.
Dostları ilə paylaş: