Standard Operating Procedure for Chemical Handling and Storage



Yüklə 451,69 Kb.
Pdf görüntüsü
səhifə39/39
tarix30.12.2023
ölçüsü451,69 Kb.
#164761
1   ...   31   32   33   34   35   36   37   38   39
Chemical Handling and Storage 0

NOTES: 
 
a.
Percentages shall be of the maximum allowable quantity per control area shown in 
Table F2703.1.1(1) and Table F2703.1.1(2), with all increases allowed in the 
footnotes of those tables. 
b.
There shall be a maximum of two control areas per floor in Group M occupancies 
and in buildings or portions of buildings having Group S occupancies with storage 
conditions and quantities in accordance with §F2703.11. 
c.
Fire barriers shall include walls and floors as necessary to provide separation 
from other portions of the building.


Standard Operating Procedure for Chemical Handling and Storage 
EHS-00005 R12

Printed copies are considered uncontrolled. Verify revision prior to use.


 
DCN1216 
CNSE Confidential
Page 43 of 43 
Appendix H 
 
 
 
 
Exception to SUNY PI, CNSE EHS-00005: 
Standard Operating Procedure for Chemical Handling and Storage 
This letter provides authorization for hand pouring per the attached documents. This 
authorization is valid for:
Requestor name: 
Company name: 
Hand pouring of :  to create a % solution 
Quantity:
Location:
Time period/frequency of operation: 
Required Signatures: The following signees have reviewed, understand and will comply 
with all relevant documents including the site specific standard operating procedures 
(SOP), work instructions, job hazard analysis (JHA), material compatibility, and 
confirmed that no uncontrolled reactions will take place.
Requestor: _________________________ 
Requestor’s Supervisor: ____________________________ 
Requestor’s Company EHS: _________________________ 
Air Liquide Management: ____________________________ 
Air Liquide EHS: ____________________________________ 
CNSE Chemical Mixing Area Owner: ___________________________________ 
CNSE EHS Representative: ________________________________ 
CNSE VP of EHS: ____________________________ 
Required Attachments: 

Standard Operating Procedure (SOP) 

Safety Data Sheets for all chemistries 

Non-Routine Hazardous Work Permit

Job Hazard Analysis 

Yüklə 451,69 Kb.

Dostları ilə paylaş:
1   ...   31   32   33   34   35   36   37   38   39




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə