INSTALLATION GUIDE AND SAFETY MANUAL



Soundproofing Made Simple

®

2900 Westinghouse Blvd. Suite 106

 

 Charlotte, NC 28373



Toll Free (888) 666-5090  

  Fax (704) 504-1115  



  www.soundisolationcompay.com




Phone: (704) 504-1127 

 Toll Free (888) 666-5090 



 Fax (704) 504-1115 

 www.soundisolationcompany.com



2

INSTALLATION GUIDE

Green Glue is the highest performance viscoelastic 

material available to the building and construction 

markets. It yields unprecedented damping factors 

and is remarkably tolerant to real-world installation 

conditions, carrying none of the burden of installation 

precision of many other damping systems.

• Non toxic

• No mixing required

• Superior performance relative to competitive products

• Faster coverage and lower material cost allow

considerably reduced application cost

• Walls/floors/ceilings with superb low frequency

attenuation

Additional Requirements for GG System

Green Glue Sealant

Sealtight Putty Pads

Copyright 2007 Sound Isolation Company  No part of this 

document may be reproduced, in whole or in part, without 

the specific written permission of SIC.



Installation Guide and Safety Manual

Green Glue Sound Isolation Compound

Working Time ............................................

 >30 minutes

Cure Time ...........................................................7 days

Viscosity ................................

 Light Paste 

Odor ...................................................Mild (Temporary)

VOC .................................................................

 <2g/liter

Flash Point ..................................................>200 deg F

Application Temp  ......................................40-90 deg F

Damping Factor: ...............Typically .50+ with 2 sheets

of 5/8 fire code drywall

SUGGESTED COVERAGE

2 Tubes per 4 x 8 sheet



ADVANTAGES

SPECIFICATIONS


2900 Westinghouse Blvd. Suite 106 

 Charlotte, NC 28273



INSTALLATION GUIDE & SAFETY MANUAL



VENTILATION & CLEAN UP

Green Glue is easily cleaned up with soap and water. Be sure to 

clean as you go; it’s best not to allow Green Glue to dry before clean 

up. Gently use a paint scraper to remove any dry product on walls, 

do not use a cleaner that will damage any floors or furniture if Green 

Glue is present.



STEP 1 - Hanging the First Layer of Drywall

Use normal drywall screws to attach the board to the 

studs/joists following your local building codes. 

Each layer of drywall should have a 1/4” gap at the perimeter, this 

includes top, bottom and both ends of the wall or floor. It is  

important that soundproof surfaced no be hard butted to those that 

are not- this will enable vibration to possible hinder results. 

Mudding seams is required for both layers to insure best results, one 

coat is usually sufficient, taping is optional for first layer. Optional 

use of acoustical sealant at seams may provide better results.



Step 2 Application Of Green Glue

Carefully cut tip of tube, screw on the application nozzle. 

Cut tip of application nozzle at 45 degree angle to a minimum 3/8" 

opening- a larger opening will allow quicker installation 1/2" is not 

too big at all.

Apply Green Glue in a random pattern covering the entire area, leave 

some room at perimeter for drywall sheets for handling the boards 

without getting hands in the Green Glue.

Note- Green Glue is UL Certified and has complete environmental 

testing. Please contact us for any required documentation



WALL INSTALLATION GUIDE

• Use a standard quart size caulking gun to apply Green Glue.

• Normal application time is 30 seconds per tube

• Green Glue is applied to boards flat on the floor, not on the wall

• Complete coverage is not the correct method of installation

• No rolling, troweling or painting; a random pattern of Green Glue

provides the best performance.

Install first layer of drywall

 Use acoustical caulk along perimeter.

Cut a 3/8” or more opening in application nozzle.




Soundproofing made simple

2900 Westinghouse Blvd. Suite 106  

n

  Charlotte, NC 28273



Phone: (704) 504-1127  

n

  Toll Free (888) 666-5090  



n

  Fax (704) 504-1115  

n

  www.soundisolationcompany.com



10-502

BULk GREEN GLUE PAIL INSTALLATION GUIDE 

It Is recommended to use our re-loadable gun and follower plate. thIs wIll save tIme, product and money

.

Remove gun from box, operate plunger 



several times to verify it is working correctly. 

Cut 3/8” opening in tip.



OptiOn: Use a 3/8” notched trowel, apply in a random 

pattern. Full coverage is not recommended.

Green Glue will be applied to second layer of drywall, 

flat on the ground. Green Glue will be installed over 

first layer of subfloor, before second layer is installed. 

STAGGER ALL SEAMS.



1

DO NOT PUT TIP ON GUN; with plunger 

almost fully depressed gently push open tube 

onto gasketed opening until sealed. 



3

DiSCLAiMER: These application notes represent generally accepted procedures 

for successful installation. Sound Isolation Company reserves the right to alter these 

suggestions and encourages contact with the factory or its representatives to review 

any possible modification to these application notes prior to commencing installation.



2

Remove top from pail, gently set follower plate 

on open pail with Gasket and hole facing up.

4

Gently push down on plate with gun and pull 

up on plunger until the tube is full.  By using 

proper pressure you should not see leaks 

where follower plate meet the pail walls.

5

Twist on tip and apply Green Glue in a 

completely random pattern; for drywall leave 

a perimeter gap to avoid wetting hands 

during installation.

6

Repeat steps 1-5 until pail is empty, remove 

follower plate and go to next bucket.

CLEAn Up: Clean up any excess Green Glue with 

soap and water, immediately clean gun. spray 

inside tube, and working parts with WD-40, operate 

plunger and store in a dry clean location.

When sealing partially used pails fo Green Glue it is 

suggested to use clear poly sheeting over bucket 

and then apply top to completely seal the pail. 

2” Border

Random Green 

Glue Pattern




CÓMO INSTALAR EL GREEN GLUE

Se puede distribuir fácilmente un tubo de Green Glue en 15 segundos. 

El Green Glue no fluirá de la tabla al instalar

Utilice una pistola para calafatear del tamaño uniforme de un cuarto de galón.

No es necesario tener una cobertura específica  para obtener resultados excelentes.

No hace falta medir ni allanar.



LIMPIEZA DEL GREEN GLUE:

 El Green Glue mojado es bastante fácil de limpiar

con agua y jabón.  Igual que algunas masillas para calafatear y adhesivos, el Green Glue 

es difícil de limpiar una vez que se haya secado, así que tenga cuidado. Utilice protectores 

de tela o plástico para cubrir cualquier superficie que no quiera que se ensucie. Limpie el 

Green Glue antes de secar.  Si está intentando de limpiar después que se haya secado, deje 

que se moje el área con agua y jabón ya que esto ayudará.  Como se mantiene pegajoso 

mientras  esté  seco,  el  uso  de Avon  Skin  So  Soft©  durante  la  limpieza  prevendrá  que  se 

le pegue.  Se puede aplicar el barro de tabla de yeso sobre el Green Glue mientras que 

la capa del pegamento sea delgada.   También, se puede pintar sobre el Green Glue seco 

mientras que las capas del pegamento sean delgadas.   Si las capas son muy gruesas, la 

pintura se puede quebrar.  Tenga cuidado de que el Green Glue no se ensucie la superficie 

que va a ser terminada

OLOR  GREEN  GLUE:

  El  Green  Glue  es  oloroso.  De  la  misma  manera  que  Ud.

puede oler pintura mientras pinta un cuarto, también podrá oler el Green Glue mientras se 

aplica. Mantenga el cuarto bien ventilado para  prevenir una obstrucción del olor.   Green 

Glue no tiene olor una vez que se haya secado.

COLGANDO LA PRIMERA TABLA DE YESO:

 Después de colgar la primera

tabla de yeso, se recomienda que Ud. selle las juntas entre las tablas. Esto se puede hacer 

con  masilla  para  calafatear  o  barro  de  tablas  de  yeso.   Tome  cuidado  de  no  utilizar  una 

cantidad  muy  grande  de  cualquier  de  los  dos  productos  que  esto  puede  prevenir  que  la 

segunda tabla no se siente plano (abajo). Si el tiempo es un asunto, se puede omitir este 

paso y sellar el perímetro después que la última tabla de yeso se instale.

LA APERTURA DEL TUBO GREEN GLUE:

 Corte la punta dejando una apertura

de 3/8”.   Use un clavo o una pieza de alambre para romper el sello.

APLICANDO  EL  GREEN  GLUE:

  Aplique  el  Green  Glue  a  la  espalda  de  la

segunda tabla sobre una superficie limpia y plano.  El uso de un banco de trabajo ayudará 

en prevenir que la tabla se ensucie o que se dañe en el piso.  Aplique el Green Glue al azar 

en granos de 3/8”.

DEJANDO UN MARGEN ALREDEDOR DE LA MATERIA:

 

Deje un margen de 2-3 pulgadas alrededor de la orilla de la materia de la tabla de yeso o 



construcción. Esto le permitirá llevar la hoja sin llenarse las manos con Green Glue.

COLGANDO LA SEGUNDA TABLA:

 Después de la aplicación del Green Glue,

hay que usar los tornillos normales de la tabla de yeso para enroscarla a los montantes. El 

Green Glue esparcirá las gotas grandes en una capa delgada (acerca de 0,5 mm). Apriete 

la  tabla  de  yeso  con  la  materia  contra  la  pared  o  el  techo  y  enróscala  a  los  montantes.  

Instale la segunda tabla con Green Glue dentro de 15 minutos para prevenir que se seque.  

Hay que enroscar las tablas mientras que el Green Glue esté mojado.  Asegúrese de seguir 

las  reglas  y  códigos  de  la  construcción  de  su  área  con  respeto  al  tipo  de  tornillos  y  los 

espacios necesarios.

NEGACIÓN:    Como  hay  tantas  variables  durante  la  instalación  que  puedan  ser  fuera  de  nuestro  control,    nosotros  no  somos 

responsables ni obligados por daños incidentales o consecuenciales, sostenidos directamente o no directamente, ni tampoco por una 

pérdida causada por la aplicación de estos productos no de acuerdo con las instrucciones actuales o por el uso previsto.  Nuestra 

responsabilidad  está  limitada  al  reemplazo  de  los  productos  defectuosos.    Cualquier  reclamo  será  renunciado  a  menos  que  nos 

escriba dentro de treinta (30) días a partir de la fecha en que el producto defectuoso fue descubierto.

(866) 435-8893 |  One Sealants Park   Granville, NY 12832  |  help@greengluecompany.com  |  greengluecompany.com

INST


ALAR

Yüklə 36,94 Kb.

Dostları ilə paylaş:




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə