63 

 

Annex 2: Information Booklet 



 

 

Arrangement of Tourism Infrastructure at Ananuri Castle 



Third Regional Development Project 

The Government of Georgia has asked the World Bank to support financing of the Third Regional 

Development  Project  (RDP  III)  in  Samtskhe-Javakheti  and  Mtskheta-Mtianeti  regions.  The 

proposed program of interventions will emphasize tourism and agriculture as two key pillars and 

drivers  of  economic  growth.  The  proposed  initial  project  will  focus  on  support  for  the  tourism 

sector  and  enabling  the  environment  for  the  private  sector  to  invest  in  the  above-mentioned 

regions. The Municipal Development Fund of Georgia is Executive Agency of  Third Regional 

Development Project and specific subprojects. 

The Ananuri complex is the one of the best places of tourist attractions on the military road. The 

considerable number of visitors, coming to the Ananuri complex every day necessitates improving 

the territory that approaches the complex, as well as arranging parking areas and locating some 

other infrastructure facilities. Ultimate goal of the sub-project (SP) is to improve the experience of 

visiting tourists at the Ananuri castle, as one of the main sites located along the proposed tourism 

circuit of Dusheti and thus increase number of visiting tourists to Dusheti. 

The project area is located west of the Ananuri Complex, between the Ananuri Complex and the 

main  road.  According  to  the  project,  the  whole  territory  must  be  reformed,  in  particular,  the 

bituminous pavement must be removed from the project site, where a recreation area and walking 

paths with green lawn, illumination system and decorative benches are planned to make. There are 

12 lampions planned to erect along the perimeter, and fertile soil will be delivered to the area and 

placed  in  green  moulds,  with  rolling  lawns  to  arrange  above  it.  The  paths  will  be  done  with 

thermally treated granite slabs sized 15 X 30 X 2.5-3 cm. The structure of laying the slabs is given 

in the design drawings. Granite curbs sized 10 X 20 cm will be used to make walking paths, while 

the roadway along the bituminous concrete will be arranged with basalt road curbs sized 15X30 

cm. In addition, a car parking is to be arranged on the project site. The existing bituminous concrete 

pavement  must  be  milled,  with  bitumen  removed  and  a  4-cm-thick  fine  bituminous  concrete 

leveling layer, type II, will be made. The area designated for the car parking must be marked with 

white perchlorovinyl paint by adding glass balls. The parking is planned for 23 cars, 6 buses, 4 

mini-buses and 3 parking areas are for disabled persons. The existing pavement of the access road 

to the Complex, which runs along the Aragvi gorge, must be removed, formed and a bituminous 

concrete pavement must be laid, according to type I. On the pedestrian path to the Complex with 

not little level difference, stairs with granite steps will be made on the reinforced concrete base. 



64 

 

 



All projects funded by WB must comply with the WB social and environmental safeguards. The 

WB financed projects, in their turn, require compliance with the WB safeguards and guidelines. 

WB BP/OP 4.12 Involuntary Resettlement is one of the most important safeguards guiding land 

acquisition and related  resettlement/compensation issues  during project  implementation.  In line 

with  the  principles  of  host-country  responsibility,  Georgia  is  committed  to  implement  the  WB 

financed projects in compliance with the requirements of WB BP/OP 4.12. 

Generally,  the  Georgian  legislation  is  compatible  with  the  major  provisions  of  the  WB 

Resettlement Policy but a few important differences are to be noted. The WB resettlement policy 

is directed at improving (or at least restoring) incomes and living standards, rather than merely 

compensating    people  for  their  expropriated  assets.  This  improvement  of  incomes  and  living 

standards broadens the objective of the policy to include the restoration of income streams  and 

retraining of people unable to continue their old income-generating activities after displacement. 

The  emphasis  on  incomes  and  living  standards,  in  contrast  to  the  conventional  emphasis  on 

expropriated property, expands the range and number of people recognized as adversely affected 

and affects the kind of compensation and other assistance that must be provided. Recognition of 

this broader range of adverse impacts leads to a greater appreciation of the issues to be considered 

in  resettlement  and  consequently  requires  careful  delineation  of  responsibilities,  elaborate  risk 

management and explicit and distinct resettlement planning. 

The  WB  policy  complements  the  Georgian  legislation/regulation  with  certain  additional 

requirements,  which  are  mandatory  for  the  WB  financed  projects.  In  particular,  appropriate 

planning/management instruments must be developed prior to project appraisal, like Resettlement 

Policy Framework (RPF) and Resettlement Action Pan (RAP), as appropriate 




65 

 

Table 1: Compensation Entitlement Matrix 



Type of Loss 

Application 

Number of Aps 

Compensation 

Entitlements 

Loss of Income and Livelihood 

Temporary 

reduction of 

incomes 


Formal and informal 

PAP’s in project area 

26 PAP 

PAP’s will be given 



20% of profit. The 

profit will be 

calculated by 

considering the 

subsistence minimum 

fixed for a 5-member 

family. At present, the 

subsistence minimum 

for a family of 5 is 

fixed at 338.3 GEL for 

three month.  

PAP’s will receive 

20% of: 

338.3X 3 month = 

203GEL 

Temporary 



suspention of 

incomes 


Formal and informal 

PAP’s in project area 

26 PAP,s 

PAP’s will be given 

compensation for three 

month. The 

compensation will be 

calculated by 

considering the 

subsistence minimum 

fixed for a 5-member 

family. At present, the 

subsistence minimum 

for a family of 5 is 

fixed at 338.3 GEL for 

three month.  

PAP’s will receive 2 

338.3X 3 month = 

1015 GEL

 

Tempora



ry 

reduction of 

Incomes 

Informal PAP’s outside of 

the project area 

8

 



PAP’s 

PAP’s will be given 

20% of profit. The 

profit will be 

calculated by 

considering the 

subsistence minimum 

fixed for a 5-member 

family. At present, the 

subsistence minimum 




Yüklə 0,7 Mb.

Dostları ilə paylaş:
1   ...   20   21   22   23   24   25   26   27   28




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə