Tamar Estuary  

River Health Action Plan 

41 

1. Impacts of these individual projects on Tamar Estuary Zone 1 enterococci concentrations are shown in  



Figure 12. 

 

Figure 12. Decrease in Tamar Estuary Zone 1 Concentration - Enterococci  

The New Margaret Street storage and New combined rising main can both be expected to lead to very 

substantial decreases in Tamar Estuary Zone 1 enterococci concentrations (15 per cent to 16 per cent). The 

West Launceston diversion is also very cost effective, leading to an 8 per cent decrease in concentrations for less 

than 20 per cent of the cost of the New combined rising main. 

However, the expected increase in flows to Ti Tree Bend treatment plant required exploration to see how the 

plant’s performance would be effected. Ti Tree Bend treatment plant was primarily designed to remove 




Tamar Estuary  

River Health Action Plan 

42 

suspended solids and treat pathogens from the combined system and, while has some benefits for reducing 



nutrient levels in effluent, it is not its primary purpose. The following figure shows how Ti Tree Bend functions. 

Figure 13. Ti Tree Bend treatment process 

Essentially, flows of up to 200ML/day will receive screening going into the plant, which stops a lot of the large 

pathogen carrying matter overflowing straight into the Estuary in very large rainfalls. Up to 120ML/day of flow 

goes on to receive primary treatment (essentially chlorine dosing), while the balance is discharged to the Estuary 

after the initial screening. Around 60ML/day goes on to receive secondary treatment, with the remainder that has 

received primary treatment bypassing that stage and discharged to the Estuary. In dry weather conditions, flows at 

Ti Tree Bend are around 12.2 ML/day.  

While the plant performs soundly with respect to treatment of pathogens in dry and low rainfall conditions, 

TasWater’s available influent and effluent monitoring from the plant suggests that in times of high rainfall, where 

flows are large, there is decreased efficiency in primary and secondary plant performance in terms of treatment of 

nutrients. The available data is inconclusive on the degree of that efficiency loss, but it would seem that higher 

levels of flow have the impact of mobilising nutrients already in the plant, such that nutrient load exiting the plant 

is higher than the load entering the plant once flows reach around 30ML/day for nitrogen and 90ML/day for 

phosphorous. 

As can be seen in Figure 14, the vertical change in the blue line represents the amount of avoided nitrogen from 

reduced combined system overflows due to the proposed projects, while the vertical change in the red line 

represents the increased nitrogen load that would exit Ti Tree Bend for the same level of flow.  



Tamar Estuary  

River Health Action Plan 

43 

Figure 14. Example of change in TN load discharged with a change in influent volume 

Clearly, while the benefits of the proposed projects for pathogen reduction are expected to be significant in total 

and have additional benefits in terms of reducing nutrient loads from combined system overflows, the Taskforce 

was of the view that all this benefit would be undone if the ecological health of the Estuary was made worse by a 

net higher level of nutrients then entering the Estuary. 

TasWater had previously looked at the potential benefits of upgraded nutrient treatment at Ti Tree Bend, utilising 

analysis conducted by CH2M Australia Pty Ltd and this forms part of the Stage 2 LSIP planning that focuses on a 

series of improvements at the existing Ti Tree Bend plant which could total up to $100 million.  

Through this work TasWater looked at the costs and effectiveness of several potential nutrient upgrade options, 

but for the purpose of this analysis the Working Group, in discussion with TasWater, incorporated intermittently 

aerated bioreactor, aerobic bioreactor and sidestream deammonification components. The cost of these works 

was estimated at around $10 million. CH2M Australia estimated total nitrogen effluent loads would decrease by 

roughly 53 per cent and total phosphorous by 72 per cent as a result of this upgrade.  

These assumptions were added to the proposed combined system projects and Figure 15 shows the expected 

impacts on Tamar Estuary Zone 1 concentrations. This figure shows very substantial benefits of the treatment 

plant upgrade in terms of decreased nutrient concentrations. It is estimated that total phosphorous 

concentrations would be expected to decrease by 18 per cent and total nitrogen by 26 per cent. While the 

TasWater/CH2M work was largely desktop and further detailed design is needed to be confident about the 

costing of this project and the magnitude of these reductions, it would seem that an investment of $10 million in 

nutrient removal upgrade would offset the decline in performance expected at Ti Tree Bend with increased flows. 




Tamar Estuary  

River Health Action Plan 

44 

Figure 15. Cost versus estimated decrease in Tamar Estuary Zone 1 concentrations  

This investment option allows the benefits of reduced combined system overflows in terms of enterococci to be 

retained while substantially decreasing nutrient concentrations, avoiding the potential decline that could be 

expected without such an upgrade. 

6.3

 

 Summary of investment plan and expected timing 



The table below outlines the projects and actions recommended that the Taskforce believe will yield the best 

value for money improvements to the Estuary. 



Projects 

Estimated Cost ($ 

million) 

Catchment Actions 

 

Brumbys-Lake, Macquarie, Meander & Tamar - Dairy  1.10 



North Esk - Grazing 

1.33 


Upper Tamar – Grazing 

1.66 


Brumbys-Lake, Meander and South Esk – Grazing 

5.41 


Launceston sewage stormwater intrusion 

0.50 


Combined system actions 

 

Esplanade storage 



6.7 

Forster St storage 

8.4 

New Margaret St storage 



10.0 

South Launceston Diversion 

18.1 

West Launceston Diversion 



4.6 


Yüklə 1,91 Mb.

Dostları ilə paylaş:
1   ...   10   11   12   13   14   15   16   17   18




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə