Haiphong department of transport


Road section from Km 4+60 to Km 5+220



Yüklə 1,53 Mb.
səhifə12/21
tarix06.05.2018
ölçüsü1,53 Mb.
#41817
1   ...   8   9   10   11   12   13   14   15   ...   21

Road section from Km 4+60 to Km 5+220



Crossing An Kim Hai canal




The route will run through residential areas and cut the local road

ATTENTION & NOTES DURING CONSTRUCTION :

Arrange sufficient staff for traffic control and diversion

At intersections, establish temporary roads, and provide dust suppression.



The route will cut An Kim Hai canal and a ditch which is perpendicular with Road No. 351, and run under the high-voltage electric line.

ATTENTION & NOTES DURING CONSTRUCTION:

It is necessary to ensure the operation of irrigation system is maintained and it is prohibited to directly discharge/throw rubbish/wastes into this canal

Deflection of HV wire is only about 10 m from the ground surface. Contractor to check EMF (Electromagnetic Field) in order to ensure adequate elevation under the high-voltage electric line.

ATTENTION & NOTES DURING OPERATION

Constantly check the crossing point between the electric line and the route, to prevent potential risks in rain.



cut existing canal and high-voltage electric line




Crossing Road No. 351




The routes will cut Road No. 351 where there is high traffic density.

ATTENTION & NOTES DURING CONSTRUCTION:

Arrange warning signs in accordance with regulations.

Limit using Road No. 351 as a construction road.

Establish signs, warning lamps and traffic signals at this place.

`


SITE SPECIFIC MITIGATION PLAN – N6

Kien Phong Pagoda



Road section from Km 5+220 to Km 6+365





ATTENTION & NOTES DURING CONSTRUCTION

Intensify mitigation measures and limit construction activities out of administrative time (break of residents) near residential areas

Noise and exhaust fume dispersion might have affects on nearby cultivation plots; therefore, the Contractor should pay attention to implement inventory and compensation for these damages and affects.

CURRENT SITUATION

The route will runs through the outer corner of residential area and some households (which will be affected by construction but be isolated by the route)

The cultivation area is quite small; some areas of existing ditch will be cut by the route and should be replaced by road-crossing culverts as designed.












Separated ditch



The beginning section of the ditch is separated





CURRENT SITUATION

The route mainly runs through cultivation area. It is far away from residential areas and nearly overlaps the administrative border between Dong Thai and Hong Tai communes.

At the ending section of the route, the route cuts the local road of Xich Tho village.

Some households (which shall not be relocated) will be only 20 cm far away from the road edge.

Te Chu pagoda is located near the route will be likely affected by the noise.



ATTENTION & NOTES DURING OPERATION

Prepare construction plans to coordinate with harvest time of the locality and ensure a temporary flow of irrigation water.

Study the solution for local roads for remaining households or intersection or local roads which are connected with road No.351 or An Kim Hai canal

Establish row of trees for reducing noise and air pollution for residential areas (in Hy Tai village) and following the direction of Kien Phong pagoda.





SITE SPECIFIC MITIGATION PLAN – N7





Road section from Km 7+455 to Km 8+565







ATTENTION & NOTES DURING CONSTRUCTION

Implement main mitigation measures when implementing construction activities on cultivation area: implementing temporary water transfer for irrigating at separated positions, arranging construction plan in suitability with harvest time,

Priority should be given to construction at this place and local road for serving preceding route sections (N5-N7)

KẾ HOẠCH QUẢN LÝ MÔI TRƯỜNG – N8

Hoang Mai pagoda – sensitive place



SITE SPECIFIC MITIGATION PLAN – N8

CURRENT SITUATION

The route will mainly cut through cultivation area and be far away from residential areas. There are only some households close to the road.

At the ending section, the route runs close to the river, near Hoang Mai pagoda where is potentially affected by noise after the route is put into operation.

Separated canal should be replaced with culverts



Road at river dyke, expected traffic axis in the future



ATTENTION & NOTES DURING OPERATION

Establish rows of trees for reducing dust and noise for the route section near Hoang Mai pagoda and Tan De residential area which is going to be under planning.

Cultivation area at dyke footing (at route end), the productivity is not high, the remaining area is too small; therefore, it is necessary to soon prepare an alternative on changing using target (with reference to opinions of community).



SITE SPECIFIC MITIGATION PLAN – N9



Road section from Km 8+565 to Km 9+765



CURRENT SITUATION

The entire the route which runs along the left river bank is cultivation area which close to the dyke footing.

At section where the bridge crosses Truong Chinh road, there is high population density and many difficulties will be encountered during construction

Waterway traffic density is rather high on this Lach Tray river section.



110kV high-voltage line under which the route will run through



ATTENTION & NOTES DURING CONSTRUCTION

The route will cut the cultivation area; creating many favorable conditions for construction space. During construction, it is necessary to implement collecting waste water from the site and dust covering methods at areas near aquiculture areas (close to dyke footing).

Attention should be paid to waterway traffic safety during bridge construction

Control surface water pollution

Check safely for overhead construction, especially electric safety at the section where the 110kV electric line is cut by the route.

Implement traffic control and arrange staff in charge of traffic diversion (coordination of traffic police will be required at this section), in order to ensure the safety during construction.

Priority should be given to establish reasonable storages, especially gasoline storage; workshop for maintaining construction vehicles should be 100m far away from the river.



ATTENTION & NOTES DURING OPERATION

Constantly check the deflection of 110kV electric line where the route runs by and limit arising risks in stormy weather.

Implement planning and changing land using target for the cultivation plot close to dyke footing (with small area) for reducing cost.

Consider space under the bridge. It is advisable to establish flower garden and public vehicle keeping place to prevent land occupation for business and selling purposes.



Waterway traffic on Lach Tray river





Road section from Km 9+765 to Km 10+980

CURRENT SITUATION

The route section is located at residential area in Dong Hoa ward, Hang Hai college and cultivation area



SITE SPECIFIC MITIGATION PLAN – N10



Irrigation canal





Inter-village road



Irrigation canal



Attention should be made to the following matters

Irrigation system which serves agriculture activities;

Crossing points with inter-village roads;

ATTENTION & NOTES DURING CONSTRUCTION

Implement mitigation measures to reduce affects of dust, noise and traffic jam on residential area, schools near the route;

Ensure the water supply for trees in cultivation areas; Install warning signs at site and safety signs at intersections;

ATTENTION & NOTES DURING OPERATION

Return the canal system, road-crossing culvert to ensure the smooth irrigation for agriculture activities; Install signs and traffic signals at crossing point with local roads;

It is necessary to implement anti-noise methods for school, Lam Khe church



Road section from Km 10+980 to Km 11+965

SITE SPECIFIC MITIGATION PLAN – N11



Ponds and fruit garden







Pond and fruit garden





Attention should be made to the following matters:

Water supply system of aquiculture pond will be cut;

Dust and noise will be generated from construction of the route section which cuts residential area No.5, Dong Hoa ward;

Transport routes: following the dyke or waterway and local road system;

Vegetable layers and green space of the cultivation area at river embankment will be affected.

ATTENTION & NOTES DURING CONSTRUCTION

For material transport by waterway, it is necessary to strictly follow methods on waterway safety and avoid any crash. Warning signs and other safety devices should be arranged at parking and anchoring places;

Transport vehicles should be checked in aspects of loading capacity to avoid causing damages to the existing dyke structure during travelling along the dyke;

Ensure the water supply for cultivation areas and aquiculture ponds;

Implement sound methods to minimize effects of noise and dust on residential areas;

Wastes and debris which is generated from construction should be controlled as not to cause pollution and effects on ponds of residents living near the route and Lach Tray river;



ATTENTION & NOTES DURING OPERATION

Traffic safety sign system is installed at intersections of roads and dyke at river banks;

Arrange trees at road edges to minimize effects of dust and noise on adjacent residential areas, ponds and trees surrounding the river embankment;

Arrange road-crossing culverts and ensure water supply for ponds and trees at river embankment;



Water supply canal from Lach Tray river



CURRENT SITUATION

The route is located through residential areas, Lach Tray river embankment, pond and fruit garden (banana, coconut and wood trees)

The route will cut through residential area No.5, Dong Hoa ward, Lach Tray river embankment (by Niem bridge No. 2, pond and fruit garden and wood tree);



Road section from Km 11+965 to Km 13+170

SITE SPECIFIC MITIGATION PLAN – N12



Path at Goc Gang cemetery





Inter-village



Rush field







CURRENT SITUATION

The route is located at aquiculture pond, fruit garden and some residential areas surrounding river dyke;

The route will run through planned routes which have not been constructed, cut the path which serves irrigation, sub-station, Goc Gang cemetery and empty land area with only grass;

ATTENTION & NOTES DURING CONSTRUCTION

For material transport by waterway, it is necessary to strictly follow methods on waterway safety and avoid accidents. Warning signs and other safety devices should be arranged at parking and anchoring places;

Ensure continuity of water supply for ponds and cultivation area;

Avoid traffic jam when cutting local roads;

Relocation of some tombs at Goc Gang cemetery should be undertaken prior to construction commencement so local culture and customs to be respected;

Wastes and polluted land should be controlled and collected at regulated dumping yards of the city;



ATTENTION & NOTES DURING OPERATION

Road-crossing culverts will be installed for irrigation purpose at the position where the route cuts the canals;

Traffic signs should be installed at intersections;

Ensure dust suppression by use of water cart





Road section from Km 13+170 to Km 14+500

SITE SPECIFIC MITIGATION PLAN – N13



Crossing point with constructed road







Regulated canal and culvert



CURRENT SITUATION

The route is located in residential areas, ponds and on an army bases

ATTENTION & NOTES DURING CONSTRUCTION

For material transport by waterway, it is necessary to strictly follow methods on waterway safety and avoid accidents. Warning signs and other safety devices should be arranged at parking and anchoring places;

Attention should be paid to the water level increases due to tide regime and heavy rainfall during construction to avoid effects of flooding such as damages to works and equipment; It is necessary to ensure the canal at Km 14+500 is operational at all times;

ATTENTION & NOTES DURING OPERATION

Local authority should have management methods for rubbish from residential areas and enterprises at river banks and from other social activities;

For contractors’ material storage and work yards, it is necessary to develop methods to protect the environment and strictly manage generated rubbish to avoid effects on adjacent areas such as filling of canals and ditches;

It is necessary to arrange traffic safety signs at intersections;

It is necessary to use water carts on the construction site to minimize effects of dust and noise on sensitive places;

The route cuts pond and fruit garden





Road section from Km 14+50 to Km 15+240

CURRENT SITUATION

- The route will runs along existing dyke of Lach Tray river.

- The route is located between residential area and river embankment

SITE SPECIFIC MITIGATION PLAN – N14



Attention should be made to the following matters

Change the existing dyke of Lach Tray river;

Dust, noise, traffic safety and construction safety at residential areas by the dyke;

The route will run through Rao bridge footing;

The route and dyke might have effects on transport activities of material exploitation and storage yards as well as production areas of enterprises at river banks;



ATTENTION & NOTES DURING CONSTRUCTION

For material transport by waterway, it is necessary to strictly follow waterway safety rules and avoid accidents. Warning signs and other safety devices should be arranged at parking and anchoring places;

It is necessary to have fencing wall to separate construction and residential area adjacent to existing dyke and harmonization reservoir; ensure construction safety at site, traffic safety; and minimize dust and noise on residential areas;

Waste water generated from construction should be strictly managed to avoid affects on harmonization reservoir and Lach Tray river;

Transport routes is not overlapped with the route for which consideration of loading capacity should be made to avoid damages to existing structures;

Attention should be paid to the water level increate due to tide regime during construction to avoid affects caused by flooding situation such as damages to works and equipment;



Safety solutions during design stage

Dyke structure is consolidated by reinforcement steel with narrowed cross-section and re-aligned route, increasing drainage capacity and reducing erosion;

The route is arranged under the road; therefore; it will not affect traffic on the bridge;

ATTENTION & NOTES DURING OPERATION

Local authority should have management methods for rubbish from residential areas and enterprises at river banks and from other social activities;

For material storage and exploitation yards of enterprises, it is necessary to methods to protect water environment and strictly manage generated rubbish to avoid effects on adjacent areas such as filling soil of canals and ditches;

It is necessary to arrange signs along the dyke and curved sections;

It is necessary to arrange traffic safety signs at intersections;

Storage yard at river banks



Residential area at dyke edge





Yüklə 1,53 Mb.

Dostları ilə paylaş:
1   ...   8   9   10   11   12   13   14   15   ...   21




Verilənlər bazası müəlliflik hüququ ilə müdafiə olunur ©genderi.org 2024
rəhbərliyinə müraciət

    Ana səhifə