SAILESH NAIR & ASSOCIATES
- 55 -
BOB, ANKALAV BRANCH, DIST. ANAND
1, DEFENCE KARMACHARI HSG. SOC. NR. UNITED COLONY, B/H. NAVRACHANA HIGH SCHOOL, SAMA,
VADODARA – 390 008 TELE-FAX. 0265 2784382 MOB : 9898072813 / 9427602817
8.2.1.
INFORMATION
TO
BE
SUPPLIED
BY
THE
CONTRACTOR:
The Contractor shall furnish the
Bank the following:
a) Detailed industrial statistics regarding the labour employed
by him, etc.
b) The power of Attorney, name and signature of his authorized
representative who will be in charge for the execution of the
work.
c) A list of technically qualified persons Employed by him for
the execution of the work.
d) The total quantity and quality of materials used for the work.
8.2.2.
APPOINTMENT OF ENGINEERS:
a) The Contractor shall appoint a Senior Engineer to the
satisfaction of the
Architect / Bank. The Architect / Bank
shall be entitled to approve or disapprove without assigning
reasons the appointment of such Engineer proposed by the
Contractor. This condition shall be reckoned as being the
essence of the contract and its breach shall make the
Contract revocable at the option of the
Bank. The Senior
Engineer shall be assisted by a number of other Engineers
and Supervisors in the respective disciplines as required for
the smooth and satisfactory execution of the work.
b) The Engineer so appointed shall be available at all times
when required by
Architect / Bank to attend all site/office
meetings to discuss all aspects of the Contract including
design, administration, planning, fabrication, installation,
commissioning, testing and defects liability maintenance as
well as site co-ordination with all Contractors/Agencies.
c) The Senior Engineer shall not be required to be present full
time at site but shall be available at all times when required
by
Architect to attend site/office meetings to discuss any
aspect of the contract.
8.2.3.
SITE ENGINEER:
a) Successful Tenderer will have to, before receiving work
order, select suitable Engineer to be interviewed by
Architect / Bank. It will be the responsibility of the selected
engineer to ensure that minutes of site meetings are
maintained up-to-date. Contractors have to be up-to-date for
each site meeting to be held.
8.2.4.
CONTRACTOR’S
SUPERINTENDENCE
&
REPRESENTATIVE ON WORKS:
a) The
Contractor shall
give
all
necessary
personal
superintendence during the execution of the works and as
long thereafter as the
Architect may consider it necessary
SAILESH NAIR & ASSOCIATES
- 56 -
BOB, ANKALAV BRANCH, DIST. ANAND
1, DEFENCE KARMACHARI HSG. SOC. NR. UNITED COLONY, B/H. NAVRACHANA HIGH SCHOOL, SAMA,
VADODARA – 390 008 TELE-FAX. 0265 2784382 MOB : 9898072813 / 9427602817
until the expiration of the “Defects Liability Period” stated in
the Appendix hereto.
b) The Contractor shall maintain and be represented on site, at
all times while the work is in progress, by a responsible and
efficient Engineer In-charge, approved by the
Architect and
who must thoroughly understand all the trades entailed and
be constantly in attendance, while the men are at work. Any
directions, explanations instructions or notices given by the
Architect to such Engineer In-charge shall be deemed to be
given to the Contractor and shall be binding as such on the
Contractor. The Engineer-in-charge shall be thoroughly
conversant with the English Language and should be able to
read, write and speak English.
8.2.5.
DISMISSAL OF WORKMEN:
a) The Contractor shall on the request of the
Architect / Bank
immediately dismiss from the works any person employed
thereon who may, in the opinion of the
Architect, be
unsuitable or incompetent or who may misconduct himself
and such person shall not again be employed or allowed on
the works without the permission of the
Architect / Bank.
8.2.6.
OTHER PERSONS ENGAGED BY THE BANK:
a) The
Bank reserves the right to use the premises and any
portion of the site for the execution of any work not included
in this Contract which he may desire to have carried out by
other persons, and the Contractor has to allow all reasonable
facilities for the execution of such work, but is not required to
provide any plant or material for the execution of such work,
except by special arrangement with the
Bank. Such work
shall be carried out in such a manner as not to impede the
progress of the works included in the Contract, and the
Contractor shall not be responsible for any damage or delay
which may happen to or be occasioned by such work.
8.3.
SAFETY MANAGEMENT
8.3.1.
REPORTING OF ACCIDENTS TO LABOUR:
The Contractor shall be responsible for the safety of persons
employed by him on the works and shall report serious
accidents to any of them, however and wherever occurring on
the works, to the
Architect and Bank who shall make every
arrangement to render all possible assistance. This shall be
without prejudice to the responsibility of the Contractor under the
Insurance Clause of the General Conditions.
8.3.2.
Use of Explosives:
Explosives shall not be used on the works by the contractor
without the written permission of the
Architect and then only in
the manner and to the extent to which He has prescribed. When
explosives are used, the same shall be stored in a special